About Us

Precast Buildings in KSA: Who We Are

Welcome to BETOLOC MIDDLE EAST CONTRACTING LLC

On the 21st century, a company that is constructing buildings should be :

  1. More Flexible, Manageable & Easy to build
  2. Quicker than other existing ways
  3. Provide Higher Quality on the final product
  4. Delivery buildings on Time & Offer Efficient Cost whenever is suitable through Value Engineering
  5. Researching & Developing for new Technologies to improve their services

Unfortunately, the traditional practices are not providing all these aspects and become, eventually, a problem.
When the demands are:
On time, Quality, Value Engineering , New Design ideas, and breaking out of the logic of square houses / four-wall boxes, exceptional technologies must be implemented.

So considering all these factors we introducing to the market of Saudi Arabia BETOLOC Middle East Contracting LLC, which was Established specifically for those reasons.

We are here to make the difference, holding years of experience in the construction of Residential Villas , Townhouses and other also building types .
We have the proven experience and know how to support each project by using a Unique precast system – Comes directly from EUROPE called Betoloc Precast System and holds 3 European & 2 Global patents under WIPO. (World Intellectual Patent Organization) .

Our Mission in Precast Buildings

"Based on our innovations make quality buildings​"

Our Vision for Precast Buildings

"Striving for excellence, ALWAYS​"

Core Values

BETOLOC ME cares for:

  • Integrity in each of our steps
  • Bring Innovation & Creativity to the market
  • Self Commitment & Loyalty to our scope
  • Responsibility & Respect to our customers
  • Knowledgeable & well-skilled Teams.
  • Striving for excellence always
  • Maintain a Safety environment to work
  • Provide the best Quality we can

Business Values

To achieve our Mission & Vision, we -at BETOLOC ME – pledge to conduct and execute our duties by:

  • Striving to achieve customer expectations.
  • Comply with all Laws & Regulations of K.S.A.
  • Creating and maintaining a safe & productive working environment by following our H.S.E. Policy.
  • Continuously seeking a high level of teamwork

Research & Development Program

  • BETOLOC has definitive plans to grow and further develop, following the needs of the construction market of KSA & GCC.
  • BETOLOC has under design future training and development plans based on the market needs & the vision of Saudi Arabia for the following years.
  • BETOLOC has direct contact with Research and Development (R&D) international Companies & is planning to involve also Universities in KSA & Overseas for the improvement of the used Technology in order to assist the future market needs through the precast building technology.
  • BETOLOC already working for improving and upgrading the existing precast system, with new ideas, in order to develop more friendly & flexible construction ways, by using eco-friendly friendly materials & reducing the construction time to the minimum.

Quality Policy

  • Our Commitment is to bring the best Quality through meeting customer’s expectations and exceeding their requirements.
  • We aimed to provide our best services and maintain excellence in all our tasks during the construction for a project.
  • We will continue Improve our Quality system based on our customers’ feedback.
  • We will permanently act with the task to protect the Environment from any pollution.
  • We will always maintain compliance with applicable KSA laws, regulations & standards.

Safety Policy Statement

Company policy: It is the policy of BETOLOC ME to ensure a safe, healthful workplace for all its employees. Therefore, BETOLOC ME will employ an effective accident and illness prevention program that involves all its employees in the effort to eliminate workplace hazards.

Management: Is accountable for preventing workplace incidents, injuries and illnesses, by providing top-level support of safety program initiatives. Management will will be responsible for implementing this Safety Policy and ensuring compliance in all areas

Supervisors: Are responsible for supervising and training workers in safe work practices. They must enforce company safety rules and work to eliminate hazardous conditions. Supervisors shall lead safety efforts by example.

Safety Committee: The safety committee ( includes Employer and Employee )representatives are responsible for recommending HSE improvements in the workplace. This committee is also responsible for identifying hazards and unsafe work practices, removing obstacles to incident prevention and helping the company evaluate the accident and illness prevention program.

Employees: All employees are expected and encouraged to participate in safety and health program activities by: Reporting hazards, any unsafe work practices and accidents immediately to their supervisors or a safety committee representative. Always wearing (PPE) required personal protective equipment; and participating in and supporting safety committee activities.

Everyone is responsible for HEALTH & SAFETY

Redusing the hazards by not using them on site

Projects

Fabrication yard & Photos from Erections

The Betolock principle – Make it Simple!!!

  • It is an innovative system that brings conventional precast building methods a step ahead.
  • Merging the benefits of concrete and metal construction by making use of a proprietary locknut system.
  • Industrialized method simplifies the mass production of high quality building elements.
  • Offering a fast – safe shell assembly without delivery delays.

Simple -3 Steps- Design & Construction

1. Design phase

  • Client-provided design converted to our system requirements
  • Produce shop drawings & molds depending on house type (villa, townhouse, etc.)

2. Preparation in our Fabrication Yard /Production line

  • Prepare MEP items and install rebars
  • Cast concrete elements (walls & slabs)
  • Cure concrete elements

3. Storage or Erection activities

  • Elements erected on site

 

Implementation Stages

1. Design.

  • Evaluation of Architectural drawings.
  • Digitization of drawings and conversion to 3D Canvas.
  • Production of Shop Drawings.

2. Casting.

  • Preparation of formwork.
  • Installation of rebars-networks-openings according to 3D Canvas
  • Installation of fastenings according to 3D Canvas
  • Concrete casting and vibration.
  • Curing.

3. Assembly stage.

  • Lifting and fitting – securing building elements together.
  • Finalizing work.

A MOVABLE Prefab Factor

OUR casting process allows constructor to incorporate all electrical/telecom/drainage ducting into the elements, while producing accurate openings for doors and windows.
All these with ready to paint wall finish, no visible joints, using standard quality concrete.

Main features:

  1. Simple to operate.
  2. Easy to maintain.
  3. Quick change of different designs.
  4. Fast to produce building elements.
  5. Transportable to the construction site.
  6. Requires only conventional equipment.
  7. Built to size according to required construction pace.
  8. Fast return of investment.

Casting stage

1. Preparation of the formworks

  • Placing the Rebars
  • Placing the fastening bolts and screws (according to 3D Canvas)
  • Positioning of tubing and ducting

2. Pouring of concrete

  • Concrete spread in the vibration assisted formworks
  • Enabling bubble free homogenous concrete
  • No special additives required
  • Possible use of recycled concrete

3. Curing of concrete.

Assembly stage

  1. A leveled concrete base (provided) is needed for construction elements to be mounted on
  2. Lifting and positioning of building elements
  3. Screwing together wall to wall using a power wrench
  4. Positioning slab to wall using fasteners
  5. Finishing of assembly.

Certificates

Partners, Memberships & Compliance With Authorities